Home
Value of 900,000 tons
Excerpt from Geologists
Midway Gold memo
Shiner Report Summary
Dr Moots Note
 Duncan Letter with Assays
Arizona Fluorspar
Fluorspar continued
U of A Bulletin #120
Pictures
Dike close up
ore
Ore with hammer
Hog Canyon South Ore
South wash Ore
South Wash
North Shaft
Right side of Adit
Mafic Dike
Quartz vein in ore
Side of Hill
Cut in Hog Canyon
South Canyon 9-2010
Ore Picture 9-2010
Ore in Hog Canyon  9-2010
Hog Canyon Ore's 9-2010
Closeup of Dike 9-2010
Ore Everywhere 9-2010
Ore again 9-10
SW side of canyon 9-10
North Adit
Gray Wall on ffar esst side
Up Hog Canyon towards spring
North side of wash
South View
More pictures to come
Contact
Links


There is an area on the south end of Hog Canyon property where you can walk and see at least 600' X 300' X 100' of ore which would be approximately 930,000 tons of Au, Ag and PGM bearing ore. This does not include underground tunneling or the rest of the properties vast lifetime supply of ore.  This could be processed very easy for the Gold content, at:

          1/4 oz. per ton X 900,000 tons X $1600.00 oz. = $  360,000,000.00
         
          1/2 oz. per ton X 900,000 tons X $1600.00 oz. =     720,000,000.00

             1 oz. per ton X 900,000 tons X $1600.00 oz. =  1,440,000,000.00

             3 oz. per ton X 900,000 tons X $1600.00 oz. =  4,320,000,000.00

(Adjust according to Gold price fluctuation and does not include Silver or PGM recovery)

This is without re-guard to the Silver or PGM and is without going underground. It is a very small portion of the exposed ore body in that one small area and an even smaller portion of the vase ore body.

If you are putting together a quote to raise funds or just getting an idea for yourself consider the following.  There are firms in the Tucson, Arizona area that are internationally well known for their expertise in this field.  I queried several companies on costs. Independent Mining Consultants, Inc., said they would charge approximately $20,000.00 for a full ore study and you could take that to the bank. KD Engineering, also Tucson would charge approximately $150,000.00 to $250,000.00 for a scoping study, also bankable, approximately $20 million for the mill, with crusher, ball mill, froth flotation, shaker tables, etc.

Any questions call 602-697-4124 or email:  14Ginger@gmail.com or 1-4-Ginger@msn.com